
United Arab Emirates gas pipeline project
2021-03-03
Greatly reduce the on-site workload, increase the workload in the factory, improve efficiency and increase benefits;
Adopt advanced and efficient ground logistics system to reduce work intensity and provide production efficiency;
Through the optimization design of production process, the production line area is reduced and the production capacity is increased;
Equipment standardized modular design makes the equipment easy to move and arrange;
The foundation of the equipment has no special requirements to reduce the installation cost;
Meet the high efficiency of straight pipe and straight pipe lengthening work;
It can realize the mechanized group matching, welding and conveying of ultra-long tube.
Sorry,当前栏目暂无内容!
您可以查看其他栏目或返回 首页
Sorry,The current column has no content!
You can view other columns or return Home
Address:No. 1, Zhongxing West Road, Lishui District, Nanjing City, Jiangsu Province
Copyright © Nanjing Autoweld Automation Co., Ltd. All Rights Reserved
Jiangsu Public Security Network Security Permit No. 32011502010584

Follow Us