Image Name

Refining Project in Nigeria


2019-10-18

By assisting customers in the design and planning of the entire prefabrication plant, it improves the customer's project undertaking and project operation capability in the fields of oil refining and chemical industry.

0.216 labor hours per inch of diameter (labor requirements for the entire production line: 54 operating workers, including 21 auxiliary workers).

Suitable for carbon steel stainless steel and alloy steel white copper and duplex stainless steel and other materials including 2" -48" pipe diameter range.

Suitable for raw material pipe length between 4-12m pipe section length up to 12m.

 

NAEC

 

NAEC