This project aims to improve the user's overall prefabrication and implementation ability through our planning, especially for the prefabrication ability of thick wall pipes and large diameter pipes, and improve the customer's operation ability for power projects.

For the customer's plant planning, we not only provide pipe prefabrication system, but also provide prefabrication devices and back protection devices to help customers improve efficiency and ensure the overall prefabrication quality.

0.26 labor hours per inch of diameter (manpower requirements for the entire production line: 21 operators, including 10 auxiliary workers) suitable for carbon steel stainless steel and alloy steel including 2 "-48" pipe diameter range.

Suitable for raw material pipe length between 4-12m pipes, pipe section length up to 12m.

 

 