Uae Storage Tank Cluster Project
A total of 23 new storage tanks, ranging in diameter from 20 to 72m;
Aote provided the overall plan of the project implementation, equipment & welding materials, personnel on-site services and guidance, and completed the main installation of two 100,000 li storage tanks within 2 months;
Through the hydraulic jacking device for the first time, the flip construction of 100,000 vertical storage tanks was realized.
The modular hydraulic jacking device is split to complete the flip construction of the remaining 10,000 vertical storage tanks simultaneously.