Image Name

Beveled Intelligent Production line


Return to List

Product Description

● The overall planning of processing beveled parts about 329,000 pieces/year;

● Working shift system: Labor: double shift 20h, 300 days, equipment annual base 5100h

 

1

 

1

 

● Scope of implementation: Large plasma unit, small plasma unit, small flame unit, truss manipulator, sander and roller, cutting robot, handling robot, cutting table, large flanging machine, small flanging machine, cutting room, manual grinding room, centralized inspection area, KBK, sling, in-line logistics planning, edge milling machine integration, information data acquisition, line body control and management, etc. Among them, KBK, cutting room, edge milling machine, dust removal system, etc. are collected by Party A.